Data entity

BudgetControlCycleModelEntity

Links budget models to budget cycles within a budget control configuration. Each row gives the budget cycle, its time span and fiscal calendar, and the start and end dates. It is keyed by company, status, cycle and time span.

Entity name
BudgetControlCycleModelEntity
Public entity name
BudgetControlCycleModel
OData collection
BudgetControlCycleModels
Category
Reference
Module
Budgeting
Read-only
No
Data management enabled
Yes
Configuration key
LedgerAdv2BudgetCtrl
Keys
LegalEntityId, Status, BudgetCycleName, BudgetCycleTimeSpanName, BudgetCycleTimeSpanFiscalCalendarId
Staging table
BudgetControlCycleModelStaging

Use it in Power BI and Power Platform

OData URL
https://<environment>/data/BudgetControlCycleModels
Dataverse virtual table
mserp_budgetcontrolcyclemodelentity. Listed in the virtual-table catalogue. An administrator must make the virtual table visible before you can use it.
Data management
Enabled: you can use it in import and export projects.

Data sources

  • BudgetControlBudgetCycle · root
  • BudgetControlConfigurationEntity · InnerJoin to BudgetControlBudgetCycle · read-only
  • BudgetCycleEntity · InnerJoin to BudgetControlBudgetCycle · read-only

Fields (14)

Field and descriptionType / EDT / enumMandatoryOData / DataverseReferencesLineage root
BudgetModelIdIdentifier of the budget model.String
BudgetModelId
YesYesBudgetControlBudgetCycle.BudgetModelId
BudgetControlConfigurationPoints to the budget control configuration.Int64
RefRecId
YesNo (private)BudgetControlConfiguration.RecIdBudgetControlBudgetCycle.BudgetControlConfiguration
BudgetCyclePoints to the budget cycle.Int64
RefRecId
YesNo (private)BudgetCycle.RecIdBudgetControlBudgetCycle.BudgetCycle
LegalEntityIdCompany ID of the legal entity. It is the key.String
SelectableDataArea
NoYesCompanyInfo.DataArea
BudgetCycleTimeSpanNameName of the budget cycle time span.String
BudgetCycleTimeSpanName
NoYesBudgetCycleTimeSpan.Name
BudgetCycleNameName of the budget cycle.String
BudgetCycleName
NoYesBudgetCycle.Name
StartDateFirst date of the period.Date
FiscalPeriodStart
NoYesFiscalCalendarPeriod.StartDate
EndDateLast date of the period.Date
FiscalPeriodEnd
NoYesFiscalCalendarPeriod.EndDate
StatusThe status of this configuration record, such as a draft or an active version.low confidenceEnum
BudgetControlConfigurationStatus
  • Draft 0
  • Active 1
NoYesNone
InUseByUser who is currently using the configuration.String
UserId
NoYesBudgetControlConfiguration.InUseBy
BudgetCycleTimeSpanFiscalCalendarIdShort code that identifies the fiscal calendar. It is the key of the table.String
FiscalCalendarID
NoYesFiscalCalendar.CalendarId
BudgetModelTypeShows whether the budget model is a main model or a submodel.Enum
HeadingSub
  • Heading 0
  • SubModel 1
NoNo (private)BudgetControlBudgetCycle.BudgetModelType
BudgetModelSubModelIdIdentifier of the submodel of the budget model.String
BudgetModelSubId
NoNo (private)BudgetModel.SubModelIdBudgetControlBudgetCycle.BudgetModelSubModelId
BudgetModelDataAreaIdCompany (legal entity) of the budget model referenced.String
DataAreaId
NoNo (private)BudgetControlBudgetCycle.BudgetModelDataAreaId

Foreign keys (3)

Each field below points to the key of another table. Join on it in Power BI, or follow the link to an entity that exposes that table.

Need help with BudgetControlCycleModelEntity in Power BI, Power Automate or a migration? Talk to Dr Dynamics.

Email sales@drdynamics.co.uk