Holds projects, keyed by project ID. It covers the project name, customer account, dates, contract details and project value. It also includes delivery details, budget control settings and links to workers, locations and funding sources. It is a wide entity with over 100 fields.
- Entity name
ProjectEntity- Public entity name
Project- OData collection
Projects- Category
Not set- Module
Project management and accounting- Read-only
No- Data management enabled
Yes- Configuration key
Project- Keys
ProjectID- Staging table
ProjectStaging
Use it in Power BI and Power Platform
- OData URL
https://<environment>/data/Projects- Dataverse virtual table
mserp_projectentity. Listed in the virtual-table catalogue. An administrator must make the virtual table visible before you can use it.- Data management
- Enabled: you can use it in import and export projects.
Data sources
ProjTable· rootLogisticsLocation· OuterJoin toProjTable· read-onlyHcmWorker· OuterJoin toProjTable· read-onlyHcmWorker1(tableHcmWorker) · OuterJoin toProjTable· read-onlyHcmWorker2(tableHcmWorker) · OuterJoin toProjTable· read-onlyHcmWorker3(tableHcmWorker) · OuterJoin toProjTable· read-onlyDimensionDAVS(tableDimensionSetEntity) · OuterJoin toProjTable· read-onlyParentProjTable(tableProjTable) · OuterJoin toProjTable· read-onlyProjFundingSource· OuterJoin toProjTable· read-only
Fields (107)
| Field and description | Type / EDT / enum | Mandatory | OData / Dataverse | References | Lineage root |
|---|---|---|---|---|---|
ProjectIDUnique code that identifies the project. | String (20)ProjId | Yes | Yes | ProjTable.ProjId | |
AlternateProjectAnother project, pointing to ProjTable, whose budget is used as an alternative. | String (20)ProjId | No | Yes | ProjTable.ProjId | ProjTable.AlternateBudgetProject |
FixedAssetNumberFixed asset linked to the project, pointing to the fixed assets table. | String (20)AssetId | No | Yes | AssetTable.AssetId | ProjTable.AssetId |
BankDocumentTypeType of bank document for the project. The only value besides None is Letter of guarantee. | Enum
| No | Yes | ProjTable.BankDocumentType | |
CertifiedPayrollYes/No flag marking the project as using certified payroll. | Enum
| No | Yes | ProjTable.CertifiedPayroll | |
CanVerifyCostAgainstRemainingForecastYes/No flag for checking costs against the remaining forecast. | EnumNoYesId
| No | Yes | ProjTable.CheckBudget | |
TaskCompletelyScheduledYes/No flag showing whether the task is fully scheduled. | Enum
| No | Yes | ProjTable.CompleteScheduled | |
ZakatContractAmendmentAmount added to or taken from the original contract value. Used for Saudi Arabia. | RealAmountCur | No | Yes | ProjTable.ContractAmendment_SA | |
ZakatContractDateDate of the contract. Used for Saudi Arabia. | DateTransDate | No | Yes | ProjTable.ContractDate_SA | |
ZakatContractPeriodText describing the contract period. Used for Saudi Arabia. | String (60)ProjContractPeriodZakat_SA | No | Yes | ProjTable.ContractPeriod_SA | |
ZakatProjectValueValue of the project under the contract. Used for Saudi Arabia. | RealAmountCur | No | Yes | ProjTable.ContractValue_SA | |
DateOfCreationDate on which the project record was created. | DateTransDate | No | Yes | ProjTable.Created | |
CustomerAccountCustomer account for the project, pointing to the customers table. | String (20)CustAccount | No | Yes | CustTable.AccountNum | ProjTable.CustAccount |
DimensionDefault financial dimension values for the project, pointing to a dimension value set. | Int64LedgerDefaultDimensionValueSet | No | No (private) | DimensionAttributeValueSet.RecId | ProjTable.DefaultDimension |
LocationLocation record linked to the project, pointing to the logistics locations table. | Int64LogisticsLocationRecId | No | No (private) | LogisticsLocation.RecId | ProjTable.DeliveryLocation |
DeliveryNameName used for the delivery party. | String (60)CompanyName | No | Yes | ProjTable.DlvName | |
EmailEmail address stored for the project. | String (80)Email | No | Yes | ProjTable.Email | |
ActualEndDateDate the project actually ended. | DateProjEndDate | No | Yes | ProjTable.EndDate | |
ExtensionDateDate to which the project has been extended. | DateProjExtensionDate | No | Yes | ProjTable.ExtensionDate | |
SubprojectIDFormatNumber format used for subproject IDs. | String (20)NumberSequenceFormat | No | Yes | ProjTable.Format | |
HeaderYes/No flag showing whether the record is a header. | EnumProjHeader
| No | Yes | ProjTable.Header | |
JobIdentificationJob identifier linked to the project. | String (20)JmgJobId | No | Yes | ProjTable.JobId | |
JobPayTypePay type for the job: all, hourly rate or piecework rate. | EnumJmgJobPayType
| No | Yes | ProjTable.JobPayType | |
MinimumTimeIncrementSmallest block of time, as a fraction of an hour, allowed in timesheet entries for this project. | RealTSMinTimeIncrement | No | Yes | ProjTable.MinTimeIncrement | |
ProjectNameName of the project. | String (60)ProjName | No | Yes | ProjTable.Name | |
ParentProjectUnique code that identifies the project. | String (20)ProjId | No | Yes | ProjTable.ProjId | |
TransactionTypesControlledWhich transactions budget control applies to: revenues and costs, costs only or revenues only. | Enum
| No | Yes | ProjTable.ProjBudgetaryControlOn | |
BudgetControlIntervalPeriod over which the budget is controlled, such as project-to-date, year-to-date or current period. | Enum
| No | Yes | ProjTable.ProjBudgetInterval | |
ProjectBudgetManagementWay the project budget is managed, for example independent budgeting for subprojects or none. | Enum
| No | Yes | ProjTable.ProjBudgetManagement | |
BudgetOverrunDefaultDefault response when a budget is exceeded: disallow, warn or allow. | Enum
| No | Yes | ProjTable.ProjBudgetOverrunOption | |
AllowNegativeBudgetsToBeCarriedForwardYes/No flag for carrying an overspend into the next year's budget. | EnumNoYesId
| No | Yes | ProjTable.ProjCarryForwardNegativeBudget | |
CanCarryForwardRemainingBudgetsYes/No flag for carrying unused budget into the next year. | EnumNoYesId
| No | Yes | ProjTable.ProjCarryForwardRemainingBudget | |
ProjectedEndDatePlanned end date of the project. | DateProjProjectedEndDate | No | Yes | ProjTable.ProjectedEndDate | |
ProjectedStartDatePlanned start date of the project. | DateProjProjectedStartDate | No | Yes | ProjTable.ProjectedStartDate | |
ProjectGroupProject group the project belongs to, pointing to the project groups table. | StringProjGroupId | Yes | Yes | ProjGroup.ProjGroupId | ProjTable.ProjGroupId |
ProjectContractIDProject contract that the project is billed under, pointing to the project contracts table. | String (20)ProjInvoiceProjId | No | Yes | ProjInvoiceTable.ProjInvoiceProjId | ProjTable.ProjInvoiceProjId |
LedgerPostingSortPriorityWhether ledger posting settings are looked up by project or by category first. | Enum
| No | Yes | ProjTable.ProjLedgerPosting | |
SearchPriorityWhether line properties are searched by project or by category first. | Enum
| No | Yes | ProjTable.ProjLinePropertySearch | |
SalesPriceGroupSales price group for the project, relating to the price groups table. | StringProjPriceGroupID | No | Yes | ProjTable.ProjPriceGroup | |
InvoiceCostYes/No flag for invoicing cost. | EnumPSADoInvoiceCost
| No | Yes | ProjTable.PSADoInvoiceCost | |
ActiveRevisionActive forecast model revision for the project, relating to the forecast models table. | StringForecastModelId | No | Yes | ProjTable.PSAForecastModelId | |
ExternalRevisionForecast model revision used as the external revision, relating to the forecast models table. | StringForecastModelId | No | Yes | ProjTable.PSAForecastModelIdExternal | |
InvoicingMethodInvoicing method: progress, not-to-exceed, milestone or scheduled. | Enum
| No | Yes | ProjTable.PSAInvoiceMethod | |
NotesFree-text notes about the project. | String (-1)Notes | No | Yes | ProjTable.PSANotes | |
TelephoneTelephone number for the project. | String (20)Phone | No | Yes | ProjTable.PSAPhone | |
RequisitionOrPurchaseOrderControlLevel of control on requisitions and purchase orders: none, warning or control. | Enum
| No | Yes | ProjTable.PSAPReqControl | |
HourValidationWhether hour-related requisition checks use amount or hours/quantity. | Enum
| No | Yes | ProjTable.PSAPReqHourValidate | |
ItemValidationWhether item-related requisition checks use amount or hours/quantity. | Enum
| No | Yes | ProjTable.PSAPReqItemValidate | |
StatusStatus of the project: active, on hold or finished. | Enum
| No | Yes | ProjTable.PSAProjStatus | |
ProjectOrTaskShows whether the record is a project or a task. | Enum
| No | Yes | ProjTable.PSAProjTask | |
IsReadyForInvoicingYes/No flag showing the project is ready to be invoiced. | EnumNoYesId
| No | Yes | ProjTable.PSAReadyForInvoicing | |
ScheduleStatusResource scheduling status, from no requirements to fully staffed, conflict or complete. | Enum
| No | Yes | ProjTable.PSAResSchedStatus | |
DefaultOnSubprojectsYes/No flag for applying retention as the default on subprojects. | EnumNoYesId
| No | Yes | ProjTable.PSARetainIncludeLower | |
PercentToRetainPercentage of invoice amounts to retain. | RealPercent | No | Yes | ProjTable.PSARetainPercent | |
CustomerRetentionTermIdCustomer retention term that applies to the project. | String (20)PSAProjRetainScheduleId | No | Yes | ProjTable.PSARetainScheduleId | |
CalendarWork calendar used for scheduling, pointing to the calendar table. | StringCalendarId | No | Yes | WorkCalendarTable.CalendarId | ProjTable.PSASchedCalendarId |
ConstraintDateDate used with the scheduling constraint type. | DatePSAConstraintDate | No | Yes | ProjTable.PSASchedConstraintDate | |
ConstraintTypeScheduling constraint, such as as soon as possible, must start on or finish no later than. | Enum
| No | Yes | ProjTable.PSASchedConstraintType | |
DateDefault date used in scheduling.low confidence | DateTransDate | No | Yes | ProjTable.PSASchedDefaultDate | |
DurationInDaysPlanned length of the project or task in days. | RealRealBase | No | Yes | ProjTable.PSASchedDuration | |
TotalEffortInHoursTotal planned effort in hours. | RealHours | No | Yes | ProjTable.PSASchedEffort | |
EndDate1Scheduled end date. | DateSchedToDate | No | Yes | ProjTable.PSASchedEndDate | |
StartTimeScheduled start time. | TimeSchedFromTime | No | Yes | ProjTable.PSASchedFromTime | |
PSASchedIgnoreCalendarYes/No flag to ignore the resources' calendars when scheduling. | EnumPSAIgnoreCalendar
| No | Yes | ProjTable.PSASchedIgnoreCalendar | |
MilestoneYes/No flag marking the record as a milestone. | Enum
| No | Yes | ProjTable.PSASchedMilestone | |
ScheduledStaffing status: not, partially or fully staffed, or fully staffed with a conflict. | Enum
| No | No (private) | ProjTable.PSASchedScheduled | |
StartDate1Scheduled start date. | DateSchedFromDate | Yes | Yes | ProjTable.PSASchedStartDate | |
EndTimeScheduled end time. | TimeSchedToTime | No | Yes | ProjTable.PSASchedToTime | |
DurationDeterminesEndDateYes/No flag: when set, the duration decides the end date. | EnumPSADurationToEnd
| No | Yes | ProjTable.PSASchedUseDuration | |
FaxFax number for the project. | String (20)TeleFax | No | Yes | ProjTable.PSATeleFax | |
TimeMeasureWhether time is measured as hour entries or as units. | Enum
| No | Yes | ProjTable.PSATimeMeasure | |
TrackCostWhether cost is tracked as actual or standard. | Enum
| No | Yes | ProjTable.PSATrackCost | |
UnitUnit of measure symbol used for the project. | StringUnitOfMeasureSymbol | No | Yes | ProjTable.PSAUnitId | |
IsActivityRequiredForExpenseForecastYes/No flag requiring an activity on expense forecasts. | EnumRequireActivityExpenseForecast
| No | Yes | ProjTable.RequireActivityExpenseForecast | |
IsActivityRequiredForExpenseTransactionYes/No flag requiring an activity on expense transactions. | EnumRequireActivityExpenseTrx
| No | Yes | ProjTable.RequireActivityExpenseTrx | |
IsActivityRequiredForHourForecastYes/No flag requiring an activity on hour forecasts. | EnumRequireActivityHourForecast
| No | Yes | ProjTable.RequireActivityHourForecast | |
IsActivityRequiredForHourTransactionYes/No flag requiring an activity on hour transactions. | EnumRequireActivityHourTrx
| No | Yes | ProjTable.RequireActivityHourTrx | |
IsActivityRequiredForItemForecastYes/No flag requiring an activity on item forecasts. | EnumRequireActivityItemForecast
| No | Yes | ProjTable.RequireActivityItemForecast | |
IsActivityRequiredForItemTransactionYes/No flag requiring an activity on item transactions. | EnumRequireActivityItemTrx
| No | Yes | ProjTable.RequireActivityItemTrx | |
ActualStartDateDate the project actually started. | DateProjStartDate | No | Yes | ProjTable.StartDate | |
ProjectStageStage of the project, from created and estimated to in process or finished, including user-defined stages. | Enum
| No | Yes | ProjTable.Status | |
ZakatSubjectSubject text of the project. Used for Saudi Arabia. | String (60)ProjSubjectZakat_SA | No | Yes | ProjTable.Subject_SA | |
SalesTaxGroupSales tax group for the project, pointing to the sales tax groups table. | StringTaxGroup | No | Yes | TaxGroupHeading.TaxGroup | ProjTable.TaxGroupId |
ProjectTemplateYes/No flag marking the project as a template. | Enum
| No | Yes | ProjTable.Template | |
PostingLevelLevel at which timesheet entries are posted: details or summary. | EnumTSPostDetailSummary
| No | Yes | ProjTable.TimePostDetailSummary | |
ProjectTypeType of project, such as time and material, fixed-price, investment, cost, internal or time project. | Enum
| Yes | Yes | ProjTable.Type | |
CanUseAlternateProjectBudgetYes/No flag to use the alternate project's budget for budget checks. | EnumNoYesId
| No | Yes | ProjTable.UseAlternateProject | |
CanUseBudgetControlYes/No flag to turn on budget control for the project. | EnumNoYesId
| No | Yes | ProjTable.UseBudgeting | |
CategoryOption controlling whether project categories are validated. | EnumProjValidateOption
| No | Yes | ProjTable.ValidateProjCategory | |
EstimateProjectIDEstimate project linked to this project, pointing to the estimate projects table. | String (20)ProjWipId | No | Yes | ProjWIPTable.ProjId | ProjTable.WIPProject |
ReferenceWorker recorded as a reference for the project, pointing to the workers table.low confidence | Int64RefRecId | No | No (private) | HcmWorker.RecId | ProjTable.WorkerPSAArchitect |
ProjectManagerWorker who is the project manager. | Int64ProjResponsibleWorker | No | No (private) | HcmWorker.RecId | ProjTable.WorkerResponsible |
ProjectControllerWorker who is the project controller. | Int64ProjResponsibleFinancialWorker | No | No (private) | HcmWorker.RecId | ProjTable.WorkerResponsibleFinancial |
SalesManagerWorker who is the sales manager for the project. | Int64ProjResponsibleSalesWorker | No | No (private) | HcmWorker.RecId | ProjTable.WorkerResponsibleSales |
DescriptionShort description of the project. | String (60)Description | No | Yes | ProjTable.Description | |
TemplateAppliedYes/No flag; label is empty. Likely shows that a template has been applied.low confidence | Enum
| No | Yes | ProjTable.TemplateApplied | |
AlertTimeFrameWeeksWhole number of weeks; label is empty. Likely a time frame used for alerts.low confidence | Integer | No | Yes | ProjTable.AlertTimeFrameWeeks | |
LocationIDUnique ID of the location. It is the key of the table. | String (40)LogisticsLocationId | No | Yes | LogisticsLocation.LocationId | |
WorkerArchitectPersonnelNumberNumber that identifies the worker within the organisation. | String (25)HcmPersonnelNumberId | No | Yes | HcmWorker.PersonnelNumber | |
WorkerRespFinancialPersonnelNumberNumber that identifies the worker within the organisation. | String (25)HcmPersonnelNumberId | No | Yes | HcmWorker.PersonnelNumber | |
WorkerResponsiblePersonnelNumberNumber that identifies the worker within the organisation. | String (25)HcmPersonnelNumberId | No | Yes | HcmWorker.PersonnelNumber | |
WorkerRespSalesPersonnelNumberNumber that identifies the worker within the organisation. | String (25)HcmPersonnelNumberId | No | Yes | HcmWorker.PersonnelNumber | |
DimensionDisplayValueDefault dimensions shown as one text string. | String (500)DimensionDisplayValue | No | Yes | None | |
SortingId1First of three sort fields on the project, used to group or order projects. | String | No | Yes | virtual | |
SortingId2Second of three sort fields on the project, used to group or order projects. | String | No | Yes | virtual | |
SortingId3Third of three sort fields on the project, used to group or order projects. | String | No | Yes | virtual | |
DefaultInvoiceAccountCode that identifies the funding source within the contract. | String (20)ProjFundingSourceId | No | Yes | ProjFundingSource.FundingSourceId |
Foreign keys (14)
Each field below points to the key of another table. Join on it in Power BI, or follow the link to an entity that exposes that table.
AlternateProject→ProjTable.ProjId(key of ProjTable)Many ProjTable records → zero or one ProjTable record
ProjTable details: see ProjProjectV2Entity, ProjCDSProjectEntity, TrvExpMobileProjEntity
FixedAssetNumber→AssetTable.AssetId(key of AssetTable)Many ProjTable records → zero or one AssetTable record
AssetTable details: see AssetFixedAssetV2Entity, AssetFixedAssetEntity, EntAssetMaintenanceAssetV3Entity
CustomerAccount→CustTable.AccountNum(key of CustTable)Many ProjTable records → zero or one CustTable record
CustTable details: see CustCustomerV3Entity, CustFoundationExtendedEntity, CustFoundationEntity
Dimension→DimensionAttributeValueSet.RecId(key of DimensionAttributeValueSet)Many ProjTable records → zero or one DimensionAttributeValueSet record
DimensionAttributeValueSet details: see DimensionAttributeValueSetCDREntity, DimensionSetEntity
Location→LogisticsLocation.RecId(key of LogisticsLocation)Many ProjTable records → zero or one LogisticsLocation record
LogisticsLocation details: see AccountantEntity, CustPostalAddressV2Entity, DirPartyLocationPostalAddressEntity
ProjectGroup→ProjGroup.ProjGroupId(key of ProjGroup)Many ProjTable records → zero or one ProjGroup record
ProjGroup details: see ProjectGroupEntity, DimAttributeProjGroupEntity
ProjectContractID→ProjInvoiceTable.ProjInvoiceProjId(key of ProjInvoiceTable)Many ProjTable records → zero or one ProjInvoiceTable record
ProjInvoiceTable details: see ProjProjectContractHeaderEntity, ProjContractEntity, ProjCDSProjectContractEntity
Calendar→WorkCalendarTable.CalendarId(key of WorkCalendarTable)Many ProjTable records → zero or one WorkCalendarTable record
WorkCalendarTable details: see WorkCalendarEntity, HcmWorkCalendarEmploymentEntity, ResResourceSetupDataEntity
SalesTaxGroup→TaxGroupHeading.TaxGroup(key of TaxGroupHeading)Many ProjTable records → zero or one TaxGroupHeading record
TaxGroupHeading details: see TrvExpMobileTaxGroupEntity, TaxGroupEntity, BusinessDocumentTaxGroupHeadingEntity
EstimateProjectID→ProjWIPTable.ProjId(key of ProjWIPTable)Many ProjTable records → zero or one ProjWIPTable record
ProjWIPTable details: see ProjControlPeriodCompletionPctEntity
Reference→HcmWorker.RecId(key of HcmWorker)Many ProjTable records → zero or one HcmWorker record
HcmWorker details: see TrvExpMobileUserDisplayInfoEntity, BusinessProcessHeaderEntity, HcmInjuryIncidentEntity
ProjectManager→HcmWorker.RecId(key of HcmWorker)Many ProjTable records → zero or one HcmWorker record
HcmWorker details: see TrvExpMobileUserDisplayInfoEntity, BusinessProcessHeaderEntity, HcmInjuryIncidentEntity
ProjectController→HcmWorker.RecId(key of HcmWorker)Many ProjTable records → zero or one HcmWorker record
HcmWorker details: see TrvExpMobileUserDisplayInfoEntity, BusinessProcessHeaderEntity, HcmInjuryIncidentEntity
SalesManager→HcmWorker.RecId(key of HcmWorker)Many ProjTable records → zero or one HcmWorker record
HcmWorker details: see TrvExpMobileUserDisplayInfoEntity, BusinessProcessHeaderEntity, HcmInjuryIncidentEntity
Need help with ProjectEntity in Power BI, Power Automate or a migration? Talk to Dr Dynamics.