Table

LedgerPeriodCloseProject

Closing schedule

Holds closing schedules, each covering a period with a start and end date. A schedule is identified by its name and can be created from a template. It links to a closing calendar, and its tasks are stored in the closing schedule tasks table.

Table name
LedgerPeriodCloseProject
Module
General ledger
Table group
Miscellaneous
Table type
Regular
Data per company
No
Configuration key
LedgerBasic
Primary index
None
Replacement key
Name
Key fields
Name
Model
ApplicationWorkspaces

Fields (12)

Field and descriptionType / EDT / enumMandatoryReferencesIn public entities
NameUnique name of the closing schedule.String
LedgerPeriodCloseProjectName
YesLedgerPeriodCloseProjectEntityLedgerPeriodCloseProjectTaskEntity
CalendarPoints to the closing calendar record used by the schedule.Int64
RefRecId
NoLedgerPeriodCloseCalendar.RecIdLedgerPeriodCloseProjectEntity
DescriptionShort text describing the schedule.String (60)
LedgerPeriodCloseProjectDescription
YesLedgerPeriodCloseProjectEntity
EndDateLast date of the period that the schedule covers.Date
LedgerPeriodCloseProjectEndDate
YesLedgerPeriodCloseProjectEntity
IsProjectCompleteShows whether the schedule is locked (Yes or No).Enum
NoYes (enum)
NoLedgerPeriodCloseProjectEntityLedgerPeriodCloseProjectTaskEntity
LegalEntitySelectionSelection of the company or companies that the schedule applies to.String (30)
LedgerPeriodCloseLegalEntitySelection
YesLedgerPeriodCloseProjectEntity
PartitionA system field for the data partition. In most environments every record has the same value. System field.Int64
Partition
NoNone
RecIdA unique number that the system gives to every record. Other tables often use it to point to this record. System field.Int64
RecId
NoLedgerPeriodCloseProjectEntity
RecVersionA system number that changes each time the record is updated. It is used to detect conflicting updates. System field.Integer
RecVersion
NoNone
SourceTemplateName of the template the schedule was based on.String (60)
LedgerPeriodCloseTemplateName
YesLedgerPeriodCloseProjectEntity
StartDateFirst date of the period that the schedule covers.Date
LedgerPeriodCloseProjectStartDate
YesLedgerPeriodCloseProjectEntity
TableIdA system number that identifies the table. System field.Integer
TableId
NoNone

Indexes (1)

  • NameReplacement key

    Name

    Unique, alternate key.

Relations (1)

Each relation joins LedgerPeriodCloseProject to another table on the fields shown.

  • Calendar → LedgerPeriodCloseCalendar

    Join on Calendar = LedgerPeriodCloseCalendar.RecId

    Many LedgerPeriodCloseProject records → zero or one LedgerPeriodCloseCalendar record

Get this data out

Tables are not exposed directly. These public entities read from LedgerPeriodCloseProject; use one of them in Power BI, Power Platform or a data management project.

Need help with LedgerPeriodCloseProject in a report, an integration or a migration? Talk to Dr Dynamics.

Email sales@drdynamics.co.uk