Table
ReqPlanSched
Master plan setup
Holds the setup of master plans, identified by ReqPlanIdSched. It sets margins, time fences, what supply and demand to include, and scheduling and firming options. It links to ReqPlan, NumberSequenceTable and quotation probability groups.
- Table name
ReqPlanSched- Module
Master planning- Table group
Group- Table type
Regular- Data per company
Yes- Configuration key
Req- Primary index
PlanIdx- Replacement key
None- Key fields
ReqPlanIdSched- Model
Foundation
Fields (85)
| Field and description | Type / EDT / enum | Mandatory | References | In public entities |
|---|---|---|---|---|
ReqPlanIdSchedIdentifier of the master plan. Points to ReqPlan. | StringReqPlanIdSched | Yes | ReqPlan.ReqPlanId | None |
ActionUpdReqDatePurchYes/no option to update the postponed date as the requirement date. | EnumNoYesIdNoYes (enum) | No | None | |
BottleneckSchedulingYes/no option for finite capacity on bottleneck resources. | EnumSchedLimitBottleneckNoYes (enum) | No | None | |
CovCapLimitedYes/no option for finite capacity. | EnumSchedLimitCapNoYes (enum) | No | None | |
CovPropertyLimitedYes/no option for finite property. | EnumSchedLimitPropertyNoYes (enum) | No | None | |
CovSchedMethodScheduling method: operations scheduling or job scheduling. | EnumProdSchedMethod (enum) | No | None | |
CovTimeFenceSchedBackTime fence for backward scheduling of capacity. | IntegerSchedTimeFenceBackSearchCap | No | None | |
DataAreaIdThe company (legal entity) that the record belongs to. System field. | String (4)DataAreaId | No | None | |
DemandForecastExcludeDaysNumber of upcoming days for which demand forecasts are left out in Planning Optimization. | IntegerReqDemandForecastExcludeDays | No | None | |
DemandForecastExcludeDaysFixedYes/no option that fixes the forecast exclusion days. | EnumNoYes (enum) | No | None | |
FilteringOnOrderQtyEnabledYes/no option to leave out items without on-order quantity. | EnumNoYesIdNoYes (enum) | No | None | |
FuturesSchedYes/no option to update planning with calculated delays. | EnumNoYes (enum) | No | None | |
FuturesUpdReqDatePurchYes/no option to update the requirement date on planned purchase orders. | EnumNoYesIdNoYes (enum) | No | None | |
FuturesUpdReqDateTransferYes/no option to add the calculated delay to the requirement date. | EnumNoYesIdNoYes (enum) | No | None | |
IncludePlannedIntercompanyDemandYes/no option to include planned downstream demand. | EnumReqIncludeIntercompanyDemandNoYes (enum) | No | None | |
IncludeRequisitionsYes/no option to include requisitions. | EnumReqIncludeRequisitionsNoYes (enum) | No | None | |
InheritInventStatusYes/no option to take the inventory status from intercompany supply. | EnumNoYesIdNoYes (enum) | No | None | |
IssueMarginDays deducted from the requirement date as an issue margin. | IntegerMarginIssue | No | None | |
MCRIncludePastDueContinuityYes/no option to include past due continuity. | EnumMCRIncludePastDueContinuityNoYes (enum) | No | None | |
MCRPastDueContinuityDaysNumber of past due days for continuity. | IntegerMCRPastDueContinuityDays | No | None | |
MCRPlanVersionContinuityContinuity plan version. Relates to ReqTrans. | Int64MCRPlanVersionContinuity | No | None | |
MCRTimeFenceContinuityPlanTime fence for the continuity plan. | IntegerMCRTimeFenceContinuityPlan | No | None | |
MCRTimeFenceContinuityPlanFixedYes/no option that fixes the continuity plan time fence. | EnumMCRTimeFenceContinuityPlanFixedNoYes (enum) | No | None | |
MCRUseContinuityPlanYes/no option to include the continuity plan. | EnumNoYes (enum) | No | None | |
MinimumOptimizationDaysMinimum days between material delay and operation start for just in time to apply. | IntegerReqMinimumOptimizationDays | No | None | |
MpsAutoCalculateFullRunCTPForPlanWithErrorsYes/no option to calculate batch capable-to-promise dates even if the run had errors. | EnumMpsAutoCalculateFullRunCTPForPlanWithErrorsNoYes (enum) | No | None | |
MpsAutoFirmOrdersForPlanWithErrorsYes/no option to autofirm orders without errors even when the run has errors. | EnumMpsAutoFirmOrdersForPlanWithErrorsNoYes (enum) | No | None | |
MpsExcludeSpecificTransactionsYes/no option to leave out specific sales orders or lines from planning. | EnumMpsExcludeSpecificTransactionsNoYes (enum) | No | None | |
MpsKeepSupplyForConfirmedDemandYes/no option to leave supply pegged to confirmed demand unchanged. | EnumMpsKeepSupplyForConfirmedDemandNoYes (enum) | No | None | |
MustUseLatestPossibleSupplyFirstYes/no option to use the latest possible supply first. Applies when on-hand is consumed after other supply. | EnumReqMustUseLatestPossibleSupplyFirstNoYes (enum) | No | None | |
NameName of the master plan. | String (60)Name | No | None | |
OnHandConsumptionStrategyWhen on-hand inventory is used: before or after all other supply. | EnumReqOnHandConsumptionStrategy (enum) | No | None | |
OnHandConsumptionStrategyFixedYes/no option that fixes the on-hand consumption setting. | EnumNoYes (enum) | No | None | |
OrderingMarginDays added to the item lead time as a reorder margin. | IntegerMarginOrder | No | None | |
PartitionA system field for the data partition. In most environments every record has the same value. System field. | Int64Partition | No | None | |
PdsUseShelfLifeYes/no option to use shelf life dates. | EnumPdsUseShelfLifeNoYes (enum) | No | None | |
PlannedOrderSequenceRecIdNumber sequence for planned orders. Points to NumberSequenceTable. | Int64ReqSequencePORefRecId | Yes | NumberSequenceTable.RecId | None |
PMFSeqBucketPeriodPeriod type for sequencing buckets: day, week, month or quarter. | EnumPMFDayWeeksMonthDayWeekMonth (enum) | No | None | |
PMFSeqBucketTypeBucket type for sequencing: period or calendar. | EnumPMFSeqCalendarPeriod (enum) | No | None | |
PMFSeqCovSequencingYes/no option to sequence planned orders after master planning. | EnumNoYes (enum) | No | None | |
PMFSeqSequencingBucketNumber of buckets in the campaign cycle. | IntegerPMFSeqSequencingBucket | No | None | |
PMFSeqTimeFenceSequencingTime fence for sequencing. | IntegerPMFSeqTimeFenceSequencing | No | None | |
PMFSeqTimeFenceSequencingFixedYes/no option that fixes the sequencing time fence. | EnumNoYes (enum) | No | None | |
PostponeKanbanToFutureDateYes/no option to update the requirement date on planned Kanban. | EnumReqPostponeKanbanToFutureDateNoYes (enum) | No | None | |
PreventScheduleBeforeTodayYes/no option that stops planned orders being created before the planning run date. | EnumNoYes (enum) | No | None | |
ReceiptMarginDays added to the requirement date as a receipt margin. | IntegerMarginReceipt | No | None | |
RecIdA unique number that the system gives to every record. Other tables often use it to point to this record. System field. | Int64RecId | No | None | |
RecVersionA system number that changes each time the record is updated. It is used to detect conflicting updates. System field. | IntegerRecVersion | No | None | |
ReqPlanSequenceRecIdNumber sequence for planning sessions. Points to NumberSequenceTable. | Int64ReqSequenceJobRefRecId | Yes | NumberSequenceTable.RecId | None |
SiblingOptimizationEnabledYes/no option for just in time planning of components when the parent item is delayed. | EnumNoYesIdNoYes (enum) | No | None | |
smmQuotationProbabilityIdQuotation probability percentage. Points to smmQuotationProbabilityGroup. | IntegersmmQuotationProbabilityId | No | smmQuotationProbabilityGroup.ProbabilityId | None |
SysRowVersionA system row version number that is used for change tracking. System field. | Int64SysRowVersion | No | None | |
TableIdA system number that identifies the table. System field. | IntegerTableId | No | None | |
TimeFenceActionAction time fence, in days. | IntegerTimeFenceAction | No | None | |
TimeFenceActionFixedYes/no option that fixes the action time fence. | EnumNoYes (enum) | No | None | |
TimeFenceAuthorizationAutomatic firming time fence, in days. | IntegerTimeFenceAuthorization | No | None | |
TimeFenceAuthorizationFixedYes/no option that fixes the firming time fence. | EnumNoYes (enum) | No | None | |
TimeFenceBackRequisitionTime fence for approved requisitions, in days. | IntegerTimeFenceBackRequisition | No | None | |
TimeFenceBackRequisitionFixedYes/no option that fixes the approved requisitions time fence. | EnumNoYes (enum) | No | None | |
TimeFenceBottleneckCapCapacity time fence for bottleneck resources. | IntegerSchedTimeFenceBottleneckCap | No | None | |
TimeFenceCapacityCapacity scheduling time fence, in days. | IntegerTimeFenceCapacity | No | None | |
TimeFenceCapacityFixedYes/no option that fixes the capacity time fence. | EnumNoYes (enum) | No | None | |
TimeFenceCovCoverage time fence, in days. | IntegerTimeFenceCoverage | No | None | |
TimeFenceCovFixedYes/no option that fixes the coverage time fence. | EnumNoYes (enum) | No | None | |
TimeFenceExplosionBOM explosion time fence, in days. | IntegerTimeFenceExplosion | No | None | |
TimeFenceExplosionFixedYes/no option that fixes the explosion time fence. | EnumNoYes (enum) | No | None | |
TimeFenceFiniteCapTime fence for finite capacity. | IntegerSchedTimeFenceFiniteCap | No | None | |
TimeFenceFuturesTime fence in days for calculating delays. | IntegerTimeFenceFutures | No | None | |
TimeFenceFuturesFixedYes/no option that fixes the delay calculation time fence. | EnumNoYes (enum) | No | None | |
TimeFenceLockingFreeze time fence, in days. | IntegerTimeFenceLocking | No | None | |
TimeFenceLockingFixedYes/no option that fixes the freeze time fence. | EnumNoYes (enum) | No | None | |
TimeFenceMasterPlanTime fence for the forecast plan. | IntegerTimeFenceMasterPlan | No | None | |
TimeFenceMasterPlanFixedYes/no option that fixes the forecast plan time fence. | EnumNoYes (enum) | No | None | |
TimeFenceMaxNegativeDaysNumber of negative days allowed when matching a receipt to a requirement. | IntegerReqMaxNegativeDays | No | None | |
TimeFenceMaxNegativeDaysFixedYes/no option that fixes the negative days setting. | EnumNoYes (enum) | No | None | |
TimeFenceMaxPositiveDaysNumber of positive days allowed when matching a receipt to a requirement. | IntegerReqMaxPositiveDays | No | None | |
TimeFenceMaxPositiveDaysFixedYes/no option that fixes the positive days setting. | EnumNoYes (enum) | No | None | |
UseInventOnHandYes/no option to include on-hand inventory. | EnumNoYes (enum) | No | None | |
UseMovementsYes/no option to include inventory transactions. | EnumNoYes (enum) | No | None | |
UsePurchaseReturnsYes/no option to include purchase returns. | EnumNoYes (enum) | No | None | |
UseQuotationsYes/no option to include sales quotations. | EnumNoYes (enum) | No | None | |
UseRequestsForQuoteYes/no option to include requests for quotation. | EnumNoYes (enum) | No | None | |
UseRetailSalesOrdersYes/no option to include retail sales orders. | EnumNoYes (enum) | No | None | |
UseSalesOrdersYes/no option to include sales orders. | EnumNoYes (enum) | No | None | |
UseTransferOrdersYes/no option to include transfer orders. | EnumNoYes (enum) | No | None |
Indexes (1)
PlanIdxPrimary indexUnique, alternate key.
Relations (6)
Each relation joins ReqPlanSched to another table on the fields shown.
MCRReqTrans→ReqTransJoin on
MCRPlanVersionContinuity = ReqTrans.PlanVersionMany ReqPlanSched records → zero or one ReqTrans record
PlannedOrderNumberSequence→NumberSequenceTableJoin on
PlannedOrderSequenceRecId = NumberSequenceTable.RecIdMany ReqPlanSched records → exactly one NumberSequenceTable record
ReqLog→ReqLogJoin on
ReqPlanIdSched = ReqLog.ReqPlanIdZero or one ReqPlanSched record → zero or one ReqLog record
ReqPlan→ReqPlanJoin on
ReqPlanIdSched = ReqPlan.ReqPlanIdZero or one ReqPlanSched record → exactly one ReqPlan record
ReqPlanNumberSequence→NumberSequenceTableJoin on
ReqPlanSequenceRecId = NumberSequenceTable.RecIdMany ReqPlanSched records → exactly one NumberSequenceTable record
smmQuotationProbabilityGroup→smmQuotationProbabilityGroupJoin on
smmQuotationProbabilityId = smmQuotationProbabilityGroup.ProbabilityIdMany ReqPlanSched records → zero or one smmQuotationProbabilityGroup record
Get this data out
No public entity reads from ReqPlanSched. Its data is only reachable through the application, a custom entity or a database export.
Need help with ReqPlanSched in a report, an integration or a migration? Talk to Dr Dynamics.