Holds the project management and accounting parameters. It is a very large single-record entity with over 200 fields. Settings cover defaults such as cost template, project type and item allocation key. They also cover payment terms, budget control and estimate handling. It also has settings used for Brazil, such as CFOP codes.

Entity name
ProjectParameterEntity
Public entity name
ProjectParameterEntity
OData collection
ProjectParameterEntities
Category
Parameters
Module
Project management and accounting
Read-only
No
Data management enabled
Yes
Configuration key
Project
Keys
ID
Staging table
ProjectParameterStaging

Use it in Power BI and Power Platform

OData URL
https://<environment>/data/ProjectParameterEntities
Dataverse virtual table
mserp_projectparameterentity. Listed in the virtual-table catalogue. An administrator must make the virtual table visible before you can use it.
Data management
Enabled: you can use it in import and export projects.

Data sources

  • ProjParameters · root
  • EcoResCategory · OuterJoin to ProjParameters · read-only
  • EcoResCategoryHierarchy · OuterJoin to EcoResCategory · read-only
  • PCClass · Derived to EcoResCategory
  • ProjTransCFOPOtherState (table CFOPTable_BR) · OuterJoin to ProjParameters · read-only
  • ProjTransCFOPOutsideCountry (table CFOPTable_BR) · OuterJoin to ProjParameters · read-only
  • ProjTransCFOPSameState (table CFOPTable_BR) · OuterJoin to ProjParameters · read-only

Fields (219)

Field and descriptionType / EDT / enumMandatoryOData / DataverseReferencesLineage root
ItemLumpSumAllocationKeyItem allocation key used for lump sum amounts, pointing to a forecast item allocation record.String
ForecastItemAllocationId
NoYesForecastItemAllocation.AllocateIdProjParameters.ItemLumpSumAllocationKey
TermsOfPaymentForHoursPayment terms used for hour forecasts, pointing to a terms of payment record.String (100)
PaymTermId
NoYesPaymTerm.PaymTermIdProjParameters.ForecastPaymHour
ActualCostAfterEstimateDateYes/no setting for whether actual cost after the estimate date is added to the cost to complete.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.AddActualPeriodEndToCTC
CommittedCostAfterEstimateDateYes/no setting for whether committed cost after the estimate date is added to the cost to complete.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.AddCommittedPeriodEndToCTC
CommittedCostUpToEstimateDateYes/no setting for whether committed cost up to the estimate date is added to the cost to complete.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.AddCommittedToCTC
IsAutoupdateFieldYes/no setting for automatic updating of a field during adjustments.low confidenceEnum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.AdjustAutoFieldUpdate
IsBudgetControlOutsideTheProjectHierarchyAllowedYes/no setting that allows budget control outside the project hierarchy.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.AllowBudgetOutSideHierarchy
IsDateCorrectionsOnTimesheetsAllowedYes/no setting that allows dates on timesheets to be corrected.Enum
TSAllowDateCorrection
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.AllowDateCorrection
IsEliminationWithoutPostingEstimatesAllowedYes/no setting that allows elimination without first posting estimates.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.AllowEliminationWithoutEstimate
CanAlwaysCreateAdjustmentTransactionYes/no setting to always create an adjustment transaction.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.AlwaysRegulationTrans
AmountInMillionsNumber of decimals shown for amounts displayed in millions.Integer
ProjAmount1000000Decimals
NoYesProjParameters.Amount1000000Decimals
AmountInThousandsNumber of decimals shown for amounts displayed in thousands.Integer
ProjAmount1000Decimals
NoYesProjParameters.Amount1000Decimals
IsActiveYes/no setting that turns on approval.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.ApproveActive
UserGroupUser group linked to approval, pointing to a user group record.String
UserGroupId
NoYesUserGroupInfo.idProjParameters.ApproveGroupId
IsItemConsumptionYes/no setting for automatic item consumption.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.AutomaticItemConsumption
BeginningBalancesProject journal name used for beginning balances.String
ProjJournalNameId
NoYesProjJournalName.JournalNameIdProjParameters.BegBalJournalNameId
CommittedCostHow committed cost is treated during elimination: accept, warn or give an error.Enum
ErrorTolerance
  • Accept 0
  • Warning 1
  • Error 2
NoYesProjParameters.CommittedEliminationTolerance
BillingRuleFeeJournalProject journal name used for billing rule fees.String
ProjJournalNameId
NoYesProjJournalName.JournalNameIdProjParameters.ContractLineFeeJournalNameId
DefaultCategoryExpenseDefault project category for expenses.String (30)
ProjCategoryCostId
NoYesProjCategory.CategoryIdProjParameters.CostCategory
DefaultCostTemplateDefault cost template, pointing to a project control type.String
ProjControlId
NoYesProjControl.ControlIdProjParameters.CostTemplate
IsCreateItemRequirementYes/no setting to create an item requirement for a purchase order.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.CreateItemReqForPO
CreditLineErrorType of message shown when total prepayment exceeds the external forecast: error, warning or review.Enum
CreditLineError
CreditLineErrorType
  • Error 0
  • Warning 1
  • MCRReview 250
NoYesProjParameters.CreditLineError
SetTheCostPriceAsTheSalesPriceByDefaultYes/no setting to use the cost price as the default sales price.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.DefaultCostPriceAsSalesPrice
DefaultItemAllocationKeyDefault item allocation key for forecasts, pointing to a forecast item allocation record.String
ForecastItemAllocationId
NoYesForecastItemAllocation.AllocateIdProjParameters.DefaultForecastItemAllocation
DefaultCategoryDefault procurement category, pointing to a category record.Int64
RefRecId
NoNo (private)EcoResCategory.RecIdProjParameters.DefaultICProcurCategory
DefaultSubprojectIDFormatDefault format for subproject IDs.String (20)
NumberSequenceFormat
NoYesProjParameters.DisplayFormat
DisplayTransactionsChooses what is shown for transactions: price, ledger updates or line amount.Enum
PriceAmount
  • Price 0
  • LedgerUpdate 1
  • LineAmount 2
NoYesProjParameters.DisplayPriceAmount
DefaultProjectTypeDefault project type, such as time and material, fixed-price, investment or internal.Enum
ProjType
  • TimeMaterial 0
  • FixedPrice 1
  • Investment 2
  • Cost 3
  • Internal 4
  • Time 5
  • None 6
NoYesProjParameters.DisplayProjectType
EliminatedYes/no setting for the eliminated status.low confidenceEnum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.EliminatedStatus
DefaultCategoryHourDefault project category for hours.String (30)
ProjCategoryEmplId
NoYesProjCategory.CategoryIdProjParameters.EmplCategory
DefaultJournalNamesHourProject journal name used for hours.String
ProjJournalNameId
NoYesProjJournalName.JournalNameIdProjParameters.EmplJournalNameId
CheckBudgetOnDocumentLineSaveYes/no setting to check the budget when a document line is saved.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.EnableBudgetCheckOnLineSave
IsIntercompanyResourceSchedulingAndTimesheetsEnabledYes/no setting to enable intercompany resource scheduling and timesheets.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.EnableIntercompanyTimesheet
IsProcessingInvoiceProposalsInWorkflowEnabledYes/no setting to process invoice proposals in workflow.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.EnableInvoiceProposalWorkflow
EstimatedYes/no setting for the estimated status.low confidenceEnum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.EstimatedStatus
ExpenseDeleteReducedToZeroYes/no setting to delete expense lines that are reduced to zero.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.ExpenseDeleteZero
ExpenseJournalNameIdLedger journal name used for expenses.String
LedgerJournalNameId
NoYesLedgerJournalName.JournalNameProjParameters.ExpenseJournalNameId
ExpenseLumpSumAllocationKeyProject allocation key used for lump sum expenses.String
EstimateProjAllocationId
NoYesProjAllocateKey.AllocateIdProjParameters.ExpenseLumpSumAllocationKey
ExpenseReduceCostPriority1First priority used when reducing expense cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.ExpenseReduceCostPriority1
ExpenseReduceCostPriority2Second priority used when reducing expense cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.ExpenseReduceCostPriority2
ExpenseReduceCostPriority3Third priority used when reducing expense cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.ExpenseReduceCostPriority3
ExpenseReduceCostPriority4Fourth priority used when reducing expense cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.ExpenseReduceCostPriority4
ExpenseReduceCostPriority5Fifth priority used when reducing expense cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.ExpenseReduceCostPriority5
MinimumRequirementMinimum requirement for matching when reducing expense cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.ExpenseReduceMinimumRequirement
GeneralBufferDaysNumber of general buffer days used for forecasts.Integer
ProjForecastBufferDays
NoYesProjParameters.ForecastBufferDays
TermsOfPaymentForExpensesPayment terms used for expense forecasts.String (100)
PaymTermId
NoYesPaymTerm.PaymTermIdProjParameters.ForecastPaymExpenses
TermsOfPaymentForItemsPayment terms used for item forecasts.String (100)
PaymTermId
NoYesPaymTerm.PaymTermIdProjParameters.ForecastPaymItem
IsAllocationSettingsLockedYes/no setting that locks the funding allocation settings.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.FundingAllocationSettingsLocked
ApplyPrioritySettingsFirstOrLastInFundingAllocationOrderWhether priority settings are applied first or last in the funding allocation order.Enum
FirstLast
  • First 0
  • Last 1
NoYesProjParameters.FundingPriorityPosition
GrossMarginDecimalsNumber of decimals shown for gross margin.Integer
ProjGrossMarginDecimals
NoYesProjParameters.GrossMarginDecimals
GrossMarginRatioHow the gross margin ratio is shown: markup factor, contribution ratio or markup percentage.Enum
ProjGrossMarginDisplay
  • MarkupFactor 0
  • ContributionMargin 1
  • MarkupPct 2
NoYesProjParameters.GrossMarginDisplay
HideActivityYes/no setting to hide the activity on timesheets.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.HideTimesheetActivity
HideCategoryYes/no setting to hide the category on timesheets.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.HideTimesheetCategory
HideExternalCommentsYes/no setting to hide external comments on timesheets.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.HideTimesheetExtComments
HideLinePropertyYes/no setting to hide the line property on timesheets.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.HideTimesheetLineProperty
HourDeleteReducedToZeroYes/no setting to delete hour lines that are reduced to zero.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.HourDeleteZero
HourQtyDecimalsNumber of decimals shown for hour quantities.Integer
ProjHourQtyDecimals
NoYesProjParameters.HourQtyDecimals
HourReduceCostPriority1First priority used when reducing hour cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.HourReduceCostPriority1
HourReduceCostPriority2Second priority used when reducing hour cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.HourReduceCostPriority2
HourReduceCostPriority3Third priority used when reducing hour cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.HourReduceCostPriority3
HourReduceCostPriority4Fourth priority used when reducing hour cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.HourReduceCostPriority4
HourReduceCostPriority5Fifth priority used when reducing hour cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.HourReduceCostPriority5
HourReducedMinimumRequirementMinimum requirement for matching when reducing hour cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.HourReduceMinimumRequirement
DefaultJournalNameItemInventory journal name used for items.String
InventJournalNameProject
NoYesInventJournalName.JournalNameIdProjParameters.inventJournalNameId
InvoicedYes/no setting for the invoiced status.low confidenceEnum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.InvoicedStatus
InvoiceProposalYes/no setting for the invoice proposal status.low confidenceEnum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.InvoiceProposalStatus
DefaultCategoryItemDefault project category for items.String (30)
ProjCategoryId
NoYesProjCategory.CategoryIdProjParameters.ItemCategory
ItemDeleteReducedToZeroYes/no setting to delete item lines that are reduced to zero.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.ItemDeleteZero
ItemNeverLedgerConsumYes/no setting to never post item cost to the ledger, for consumption.Enum
ProjItemNeverLedger
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.ItemNeverLedgerConsum
IsItemNeverLedgerPLYes/no setting to never post item cost to the ledger, for the profit and loss case.low confidenceEnum
ProjItemNeverLedger
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.ItemNeverLedgerPL
ItemReduceCostPriority1First priority used when reducing item cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.ItemReduceCostPriority1
ItemReduceCostPriority2Second priority used when reducing item cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.ItemReduceCostPriority2
ItemReduceCostPriority3Third priority used when reducing item cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.ItemReduceCostPriority3
ItemReduceCostPriority4Fourth priority used when reducing item cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.ItemReduceCostPriority4
ItemReduceCostPriority5Fifth priority used when reducing item cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.ItemReduceCostPriority5
ItemMinimumRequirementMinimum requirement for matching when reducing item cost.Enum
ProjReduceCostPriority
  • None 0
  • Project 1
  • Category 2
  • EmployeeItem 3
  • ParentProject 4
  • EstimateProject 5
  • ActivityNum 6
  • CategoryGroup 7
  • CostTemplateLine 8
  • ProjDate 9
NoYesProjParameters.ItemReduceMinimumRequirement
IDFixed key that identifies the single parameter record.Integer
ParametersKey
NoYesProjParameters.Key
AccrueRevenueWhether revenue accrual works by line or by total.Enum
ProjLineTotal
  • Total 0
  • Line 1
NoYesProjParameters.LineTotalAccrueRevenue
AdjustmentWhether adjustment works by line or by total.Enum
ProjLineTotal
  • Total 0
  • Line 1
NoYesProjParameters.LineTotalAdjustment
EstimateWhether estimates work by line or by total.Enum
ProjLineTotal
  • Total 0
  • Line 1
NoYesProjParameters.LineTotalEstimate
InvoiceWhether invoicing works by line or by total.Enum
ProjLineTotal
  • Total 0
  • Line 1
NoYesProjParameters.LineTotalInvoice
PostCostsWhether cost posting works by line or by total.Enum
ProjLineTotal
  • Total 0
  • Line 1
NoYesProjParameters.LineTotalPostCost
SubscriptionWhether subscription works by line or by total.Enum
ProjLineTotal
  • Total 0
  • Line 1
NoYesProjParameters.LineTotalSubscription
ApprovedTimesheetPostingWhether approved timesheets are posted manually or automatically.Enum
TSManualAutomatic
  • Manual 0
  • Automatic 1
NoYesProjParameters.ManualAutomatic
MaximumNumberOfTimesheetsPerPeriodMaximum number of timesheets allowed per period.Integer
TSMaxTimesheets
NoYesProjParameters.MaxTimesheets
MethodOfPaymentCustomer method of payment, pointing to a customer payment mode record.String
CustPaymMode
NoYesCustPaymModeTable.PaymModeProjParameters.MCRPaymMode
MinimumTimeIncrementSmallest step of time that can be entered on a timesheet.Real
TSMinTimeIncrement
NoYesProjParameters.MinTimeIncrement
MissingTimesheetsEmailIdEmail template used for missing timesheets, pointing to an email record.String
SysEmailId
NoYesSysEmailTable.EmailIdProjParameters.MissingTimesheetsEmailId
ForecastModelForecast model, pointing to a forecast model record.String
ForecastModelId
NoYesProjParameters.ModelId
FolderForMicrosoftProjectFilesFolder path where Microsoft Project files are saved.String (259)
FilePath
NoYesProjParameters.MSPClientIntegrationSyncPath
SaveMicrosoftProjectFilesToWhere Microsoft Project files are saved: a local or network folder, or a collaboration workspace.Enum
MSPIntegrationType
  • ArchiveDirectory 0
  • SharePoint 1
NoYesProjParameters.MSPIntegrationType
IsPaymentCriteriaYes/no setting for payment criteria on account.low confidenceEnum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.OnAccountPaymentCriteria
OriginalBudgetForecast model used for the original budget.String
ProjForecastModelId
NoYesProjParameters.OriginalForecastModel
DefaultPostingLevelDefault posting level: details or summary.Enum
TSPostDetailSummary
DetailSummary
  • Detail 0
  • Summary 1
NoYesProjParameters.PostDetailSummary
PostedYes/no setting for the posted status.low confidenceEnum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.PostedStatus
PostingMethodPosting method for production: finished item or consumed.Enum
ProjProdPostingTypeSetup
  • FinishedItemMethod 0
  • ConsumedMethod 1
NoYesProjParameters.ProdPostingType
TransactionTypesControlledWhich transaction types are under budget control: revenues and costs, costs only, or revenues only.Enum
ProjBudgetaryControlOn
  • RevenuesAndCosts 0
  • CostsOnly 1
  • RevenuesOnly 2
NoYesProjParameters.ProjBudgetaryControlOn
BudgetControlIntervalInterval used for budget control, such as project-to-date or year-to-date.Enum
ProjBudgetInterval
  • ProjectToDate 1
  • YearToDate 2
  • TotalYear 3
  • CurrentPeriod 4
  • TotalBudget 0
NoYesProjParameters.ProjBudgetInterval
ProjectBudgetManagementChooses how project budgets are managed.Enum
ProjBudgetManagement
  • None 0
  • Independent 1
NoYesProjParameters.ProjBudgetManagement
BudgetOverrunDefaultDefault response to a budget overrun: disallow, warn or allow.Enum
ProjBudgetOverrunOption
  • DisallowOverruns 2
  • WarnOfOverruns 1
  • AllowOverruns 0
NoYesProjParameters.ProjBudgetOverrunOption
NegativeBudgetsToBeCarriedForwardAllowedYes/no setting to carry negative budgets forward.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.ProjCarryForwardNegativeBudget
IsCarryForwardRemainingBudgetsYes/no setting to carry remaining budgets forward.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.ProjCarryForwardRemainingBudget
CostControlMethodsCost control method: remaining budget or total budget.Enum
ProjCostControlMethod
  • RemainingBudget 0
  • TotalBudget 1
NoYesProjParameters.ProjCostControlMethod
SetSubproductionToConsumedYes/no setting to set subproduction to consumed.Enum
ProjSetSubProdToConsumed
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.ProjSetSubProdToConsumed
PromptForCustomerInformationYes/no setting to prompt for customer information when transferring.Enum
ProjPromptTransfer
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.PromptTransfer
PromptForCustomerInformationOnProjectYes/no setting to prompt for customer information on a project.Enum
ProjPromptTransfer
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.PromptTransferCustOnProject
RemainingBudgetForecast model used for the remaining budget.String
ProjForecastModelId
NoYesProjParameters.RemainingForecastModel
IsActivityExpenseForecastRequiredYes/no setting that requires an activity on expense forecasts.Enum
RequireActivityExpenseForecast
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.RequireActivityExpenseForecast
IsActivityExpenseJournalRequiredYes/no setting that requires an activity on expense transactions.Enum
RequireActivityExpenseTrx
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.RequireActivityExpenseTrx
IsActivityHourForecastRequiredYes/no setting that requires an activity on hour forecasts.Enum
RequireActivityHourForecast
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.RequireActivityHourForecast
IsActivityHourJournalRequiredYes/no setting that requires an activity on hour transactions.Enum
RequireActivityHourTrx
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.RequireActivityHourTrx
IsActivityItemForecastRequiredYes/no setting that requires an activity on item forecasts.Enum
RequireActivityItemForecast
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.RequireActivityItemForecast
IsActivityItemJournalRequiredYes/no setting that requires an activity on item transactions.Enum
RequireActivityItemTrx
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.RequireActivityItemTrx
IsStartStopTimeRequiredYes/no setting that requires start and stop times on timesheets.Enum
TSRequireStartStopTime
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.RequireStartStopTime
DefaultCategoryFeeDefault project category for fees.String (30)
ProjCategoryId
NoYesProjCategory.CategoryIdProjParameters.RevenueCategory
DefaultJournalNamesFeeProject journal name used for fees.String
ProjJournalNameId
NoYesProjJournalName.JournalNameIdProjParameters.RevenueJournalNameId
HasFinishedProjectsYes/no setting to show finished projects in lookups.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.ShowClosedProjectsInLookup
HasInactiveCategoriesYes/no setting to show inactive categories.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.ShowInactiveCategories
HasTerminatedWorkersYes/no setting to show terminated workers.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.ShowInactiveEmployees
IsHourCostInConsumptionStatementIncludedYes/no setting for not posting or never ledger of hour cost, for consumption.low confidenceEnum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.StatementConsumpHourCost
IsHourQuantityInConsumptionStatementIncludedYes/no setting for not posting or never ledger of hour quantity, for consumption.low confidenceEnum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.StatementConsumpHourQty
IsHourCostInProfitLossStatementIncludedYes/no setting for not posting or never ledger of hour cost, for profit and loss.low confidenceEnum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.StatementPLHourCost
IsHourQuantityInProfitLossStatementIncludedYes/no setting for not posting or never ledger of hour quantity, for profit and loss.low confidenceEnum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.StatementPLHourQty
CalculationDateTypeDate used for tax calculation: invoice date or project date.Enum
TaxCalculationProjDateType
  • InvoiceDate 0
  • ProjectDate 1
NoYesProjParameters.TaxCalcDateType
SalesTaxGroupMethodWhere the sales tax group comes from: project, project contract, customer account or search.Enum
ProjTaxGroupMethod
  • Project 0
  • InvoiceProject 1
  • AccountReceivable 2
  • Search 3
NoYesProjParameters.TaxGroupMethod
ItemSalesTaxGroupMethodWhere the item sales tax group comes from: item number or category.Enum
ProjTaxItemGroupMethod
  • ItemNumber 0
  • Category 1
NoYesProjParameters.TaxItemGroupMethod
TaxItemGroupOnAccItem sales tax group used for on-account amounts.String
TaxItemGroup
NoYesTaxItemGroupHeading.TaxItemGroupProjParameters.TaxItemGroupOnAcc
TimesheetJournalProject journal name used for timesheets.String
ProjJournalNameIdEmpl
NoYesProjJournalName.JournalNameIdProjParameters.TimeJournalNameId
AllowTimeRangeOverlapHow overlapping time ranges are treated: accept, warn or give an error.Enum
TSTimeRangeOverlap
ErrorTolerance
  • Accept 0
  • Warning 1
  • Error 2
NoYesProjParameters.TimeOverlap
HasTimeRegistrationYes/no setting to show start and end times.Enum
ProjTimeRegistration
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TimeRegistration
AbsenceProjectProject used for absence, pointing to a project record.String (20)
ProjId
NoYesProjTable.ProjIdProjParameters.TimesheetAbsenceProjId
IsTimesheetAuditTrailRequiredYes/no setting that requires an audit trail for timesheets.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TimesheetAuditTrail
IsFutureTimesheetEntriesBlockedYes/no setting that blocks timesheet entries in the future.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TimesheetBlockFutureEntries
AllowTimesheetChangeReasonYes/no setting that allows a change reason on timesheets.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TimesheetChangeReason
RequireTimesheetChangeReasonYes/no setting that requires a change reason on timesheets.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TimesheetChangeReasonMandatory
ValidateAbsenceYes/no setting to validate absence on timesheets.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TimesheetValidateAbsence
TotalEstimatePostingToleranceHow total actual cost is treated against the estimate: accept, warn or give an error.Enum
ErrorTolerance
  • Accept 0
  • Warning 1
  • Error 2
NoYesProjParameters.TotalEstimatePostingTolerance
TotalBudgetForecast model used for the total budget.String
ProjForecastModelId
NoYesProjParameters.TotalForecastModel
ExpenseReportYes/no setting to track committed cost from expense reports.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TrackCommittedCostExpenseManagement
HourJournalYes/no setting to track committed cost from hour journals.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TrackCommittedCostHourJournal
ItemJournalYes/no setting to track committed cost from item journals.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TrackCommittedCostItemJournal
ItemRequirementYes/no setting to track committed cost from item requirements.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TrackCommittedCostItemRequirement
ProductionYes/no setting to track committed cost from production.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TrackCommittedCostProduction
PurchaseOrderYes/no setting to track committed cost from purchase orders.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TrackCommittedCostPurchaseOrder
PurchaseRequisitionYes/no setting to track committed cost from purchase requisitions.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TrackCommittedCostPurchaseRequisition
SalesOrderYes/no setting to track committed cost from sales orders.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TrackCommittedCostSalesOrder
TimesheetsYes/no setting to track committed cost from timesheets.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TrackCommittedCostTimesheets
TravelRequisitionYes/no setting to track committed cost from travel requisitions.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TrackCommittedCostTravelRequisition
VendorInvoiceYes/no setting to track committed cost from vendor invoices.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TrackCommittedCostVendInvoice
AfterEliminationDateHow transactions after the elimination date are treated: accept, warn or give an error.Enum
ErrorTolerance
  • Accept 0
  • Warning 1
  • Error 2
NoYesProjParameters.TransAfterEliminationTolerance
BeforeEliminationDateHow transactions before the elimination date are treated: accept, warn or give an error.Enum
ErrorTolerance
  • Accept 0
  • Warning 1
  • Error 2
NoYesProjParameters.TransBeforeEliminationTolerance
UseAdjustmentDateAsNewProjectDateYes/no setting to use the adjustment date as the new project date.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.UseAdjustmentDate
UseBudgetControlYes/no setting that turns on budget control.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.UseBudgeting
UseFavoritesYes/no setting to use favourites on timesheets.Enum
TSUseFavorites
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.UseFavorites
UtilizationRateNumber of decimals shown for the utilisation rate.Integer
ProjUtilRateDecimals
NoYesProjParameters.UtilRateDecimals
ValidationWorkerCategoryValidation level between category and resource: none, lookup or mandatory.Enum
ProjValParameter
  • None 0
  • Lookup 1
  • Mandatory 2
NoYesProjParameters.ValidationEmplCategory
ValidationWorkerProjectValidation level between resource and project: none, lookup or mandatory.Enum
ProjValParameter
  • None 0
  • Lookup 1
  • Mandatory 2
NoYesProjParameters.ValidationEmplProj
ValidationProjectCategoryValidation level between project and category: none, lookup or mandatory.Enum
ProjValParameter
  • None 0
  • Lookup 1
  • Mandatory 2
NoYesProjParameters.ValidationProjCategory
ValueAddedDecimalsNumber of decimals shown for value-added figures.Integer
ProjValueAddedDecimals
NoYesProjParameters.ValueAddedDecimals
ValueAddedDisplayHow the value-added ratio is shown: factor, ratio or markup percentage.Enum
ProjValueAddedDisplay
  • ValueAddedMarkup 0
  • ValueAddedRation 1
  • ValueAddedMarupPct 2
NoYesProjParameters.ValueAddedDisplay
SetVoucherDateToDate to which the voucher date is set: timesheet period end, ledger period end or project date.Enum
TSVoucherDateChange
  • ProjPeriodEnd 0
  • LedgerPeriodEnd 1
  • ProjTransDate 2
NoYesProjParameters.VoucherDateChange
DayWeekStartsDay on which the week starts.Enum
TSWeekStart
WeekDays
  • None 0
  • Monday 1
  • Tuesday 2
  • Wednesday 3
  • Thursday 4
  • Friday 5
  • Saturday 6
  • Sunday 7
NoYesProjParameters.WeekStart
AutomaticallySetAccountingDateToOpenLedgerPeriodYes/no setting to set the accounting date automatically to an open ledger period.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.IsAccountingDateUpdateAllowed
CategoryHierarchyPoints to the category hierarchy that the category belongs to.Int64
EcoResCategoryHierarchyId
YesNo (private)EcoResCategoryHierarchy.RecIdEcoResCategory.CategoryHierarchy
CategoryNameName of the category.String (254)
EcoResCategoryName
YesYesEcoResCategory.Name
CategoryHierarchyNameName of the category hierarchy.String (128)
EcoResCategoryHierarchyName
NoYesEcoResCategoryHierarchy.Name
TimeMaterialBillablePurpose not clear from the metadata.low confidenceString (30)YesYesvirtual
TimeMaterialEfficiencyPurpose not clear from the metadata.low confidenceString (30)YesYesvirtual
FixedPriceBillablePurpose not clear from the metadata.low confidenceString (30)YesYesvirtual
FixedPriceEfficiencyPurpose not clear from the metadata.low confidenceString (30)YesYesvirtual
InvestmentBillablePurpose not clear from the metadata.low confidenceString (30)YesYesvirtual
InvestmentEfficiencyPurpose not clear from the metadata.low confidenceString (30)YesYesvirtual
InternalCostBillablePurpose not clear from the metadata.low confidenceString (30)YesYesvirtual
InternalCostEfficiencyPurpose not clear from the metadata.low confidenceString (30)YesYesvirtual
TimeProjectsBillablePurpose not clear from the metadata.low confidenceString (30)YesYesvirtual
TimeProjectsEfficiencyPurpose not clear from the metadata.low confidenceString (30)YesYesvirtual
CapacityPlanningPlannedOrderPurpose not clear from the metadata.low confidenceStringNoYesvirtual
CapacityPlanningProductionPurpose not clear from the metadata.low confidenceStringNoYesvirtual
DefaultWorkingCalendarThe default working calendar, given as text.StringNoYesvirtual
IsHourSchedulingEnabledShows, as text, whether hour scheduling is turned on.StringNoYesvirtual
EnableCancelSettledProjectInvoiceYes/no setting for cancelling a settled project invoice, used for Brazil.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.CancelSettleProjectInvoice_BR
IsEnableAlternativeAccountForCancellationYes/no setting to enable an alternative account.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.EnableCancelPostingProfiles
AuthorizedSignatoryName of the authorised signatory, used for Brazil.String (60)
Str60
NoYesProjParameters.AuthorizedSignatory_BR
DesignationOfSignatoryJob designation of the signatory, used for Brazil.String (60)
Str60
NoYesProjParameters.DesignationSignatory_BR
EnableCancelSettledDebitNoteYes/no setting for cancelling a settled debit note, used for Brazil.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.SettledDebitnoteCancellation_BR
IsInvoicePrintingByCategoryYes/no setting to group invoices by category, used for Brazil.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.GroupInvoiceByCategoryId_BR
IsInvoicePrintingByTransactionTextYes/no setting to group invoices by transaction text, used for Brazil.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.GroupInvoiceByTransTxt_BR
IsInvoicePrintingByEmployeeYes/no setting to group invoices by employee, used for Brazil.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.GroupInvoiceByEmplId_BR
IsInvoicePrintingByInvoiceTypeYes/no setting to group invoices by invoice type, used for Brazil.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.GroupInvoiceByTransStatus_BR
IsInvoicePrintingByLineSpecificYes/no setting to group invoices by line-specific values, used for Brazil.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.GroupInvoiceByLineSpecific_BR
CFOPSameStateCFOP code for project transactions in the same state, used for Brazil.Int64
RefRecId
NoNo (private)CFOPTable_BR.RecIdProjParameters.ProjTransCFOPSameState_BR
CFOPOtherStateCFOP code for project transactions with another state, used for Brazil.Int64
RefRecId
NoNo (private)CFOPTable_BR.RecIdProjParameters.ProjTransCFOPOtherState_BR
CFOPOutsideCountryRegionCFOP code for project transactions outside the country, used for Brazil.Int64
RefRecId
NoNo (private)CFOPTable_BR.RecIdProjParameters.ProjTransCFOPOutsideCountry_BR
CFOPIdSameStateCFOP code.String (5)
CustVendCFOPId_BR
NoYesCFOPTable_BR.CFOPId
CFOPIdOtherStateCFOP code.String (5)
CustVendCFOPId_BR
NoYesCFOPTable_BR.CFOPId
CFOPIdOutsideCountryRegionCFOP code.String (5)
CustVendCFOPId_BR
NoYesCFOPTable_BR.CFOPId
IsSplitInvoiceBasedOnServiceCodeYes/no setting to split invoices by service code.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.SplitServiceCodeInvoice
NoOneTimeCustomersForProjectContractsYes/no setting that prevents one-time customers on project contracts.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.OneTimeCustOnInvoice
GeneralBudgetReservationYes/no setting to track committed cost from general budget reservations, used for public sector.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TrackCommittedCostBudgetReservation_PSN
TimeServiceEnableServiceYes/no setting that turns on the mobile timesheet app for submitting and approving timesheets.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TimesheetServiceEnableService
TimeServiceEnableDefaultLinePropertyYes/no setting that sets a default line property in the mobile timesheet app, even when category validation is off.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.TimesheetServiceEnableDefaultLineProperty
TimeServiceVisibilityActivityWhether the activity field is displayed, read-only or hidden in the mobile timesheet app.Enum
TSFieldVisibility
  • Display 0
  • ReadOnly 1
  • DoNotDisplay 2
NoYesProjParameters.TimesheetServiceVisibilityActivity
TimeServiceVisibilityCategoryWhether the category field is displayed, read-only or hidden in the mobile timesheet app.Enum
TSFieldVisibility
  • Display 0
  • ReadOnly 1
  • DoNotDisplay 2
NoYesProjParameters.TimesheetServiceVisibilityCategory
TimeServiceVisibilityCustomerWhether the customer field is displayed, read-only or hidden in the mobile timesheet app.Enum
TSFieldVisibility
  • Display 0
  • ReadOnly 1
  • DoNotDisplay 2
NoYesProjParameters.TimesheetServiceVisibilityCustomer
TimeServiceVisibilityExternalCommentWhether the external comment field is displayed, read-only or hidden in the mobile timesheet app.Enum
TSFieldVisibility
  • Display 0
  • ReadOnly 1
  • DoNotDisplay 2
NoYesProjParameters.TimesheetServiceVisibilityExternalComment
TimeServiceVisibilityInternalCommentWhether the internal comment field is displayed, read-only or hidden in the mobile timesheet app.Enum
TSFieldVisibility
  • Display 0
  • ReadOnly 1
  • DoNotDisplay 2
NoYesProjParameters.TimesheetServiceVisibilityInternalComment
TimeServiceVisibilityItemSalesTaxGroupWhether the item sales tax group field is displayed, read-only or hidden in the mobile timesheet app.Enum
TSFieldVisibility
  • Display 0
  • ReadOnly 1
  • DoNotDisplay 2
NoYesProjParameters.TimesheetServiceVisibilityItemSalesTaxGroup
TimeServiceVisibilityLinePropertyWhether the line property field is displayed, read-only or hidden in the mobile timesheet app.Enum
TSFieldVisibility
  • Display 0
  • ReadOnly 1
  • DoNotDisplay 2
NoYesProjParameters.TimesheetServiceVisibilityLineProperty
TimeServiceVisibilitySalesTaxGroupWhether the sales tax group field is displayed, read-only or hidden in the mobile timesheet app.Enum
TSFieldVisibility
  • Display 0
  • ReadOnly 1
  • DoNotDisplay 2
NoYesProjParameters.TimesheetServiceVisibilitySalesTaxGroup
AllowSalesOrdersForMultipleFundingSourcesYes/no setting that allows sales orders for projects with several funding sources.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.AllowSalesOrdersForMultipleFundingSources
ShowInvoiceSummaryYes/no setting to enable invoice summaries.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.ShowInvoiceSummary
SelectProjectInvoiceProposalByFundingSourceYes/no setting to select project invoice proposals by funding source.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.SelectProjectInvoiceProposalByFundingSource
ContractLineBasedRevenueRecognitionYes/no setting to recognise revenue per contract line.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.ContractLineBasedRevenueRecognition
EnableContractCurrencyForRevRecYes/no setting to calculate revenue recognition in the project contract currency.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.EnableContractCurrencyForRevRec
SeparateContractValFromBillingMilestonesYes/no setting to separate contract value from billing milestones.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.SeparateContractValFromBillingMilestones
ContractVarianceAccountLedger account combination used as the contract variance account.Int64NoYesDimensionAttributeValueCombination.RecIdProjParameters.ContractVarianceAccount
BlockParentActivitySelectionYes/no setting that blocks selecting a parent activity.Enum
NoYesId
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.BlockParentActivitySelection
RequireEstablishmentOnProjectInvoiceYes/no setting that requires an establishment on project invoices.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.RequireEstablishmentOnProjectInvoice
RequireRegistrationIdsOnProjectInvoiceYes/no setting that requires registration IDs on project invoices.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjParameters.RequireRegistrationIdsOnProjectInvoice

Foreign keys (29)

Each field below points to the key of another table. Join on it in Power BI, or follow the link to an entity that exposes that table.

Need help with ProjectParameterEntity in Power BI, Power Automate or a migration? Talk to Dr Dynamics.

Email sales@drdynamics.co.uk