Data entity

ProjProjectWBSDraftEntity

Holds draft work breakdown structure tasks for a project, keyed by project ID and WBS ID. Each task has a name, dates, effort in hours, duration, category, role and activity status. It also holds predecessors, hierarchy level and cost amounts.

Entity name
ProjProjectWBSDraftEntity
Public entity name
ProjectWBSDraft
OData collection
ProjectWBSDrafts
Category
Not set
Module
Project management and accounting
Read-only
No
Data management enabled
Yes
Configuration key
Project
Keys
ProjectId, WBSId
Staging table
ProjProjectWBSDraftStaging

Use it in Power BI and Power Platform

OData URL
https://<environment>/data/ProjectWBSDrafts
Dataverse virtual table
mserp_projprojectwbsdraftentity. Listed in the virtual-table catalogue. An administrator must make the virtual table visible before you can use it.
Data management
Enabled: you can use it in import and export projects.

Data sources

  • ProjPlanVersion · root
  • PSASchedRole · OuterJoin to ProjPlanVersion · read-only
  • ProjPlanVersionDetail · InnerJoin to ProjPlanVersion · read-only

Fields (31)

Field and descriptionType / EDT / enumMandatoryOData / DataverseReferencesLineage root
ProjectIdProject the version belongs to. Points to a record in the projects table.String (20)
ProjId
YesYesProjTable.ProjIdProjPlanVersionDetail.ProjId
HierarchyIdIdentifier of the hierarchy that the task belongs to.String
HierarchyIdBase
NoYesProjPlanVersion.HierarchyId
TaskIdIdentifier of the task within the hierarchy.Int64
ProjHierarchyTaskId
NoYesProjPlanVersion.HierarchyTaskId
WBSIdWork breakdown structure ID that gives the path of the task in the hierarchy.String (255)
ProjHierarchyPathId
YesYesProjPlanVersion.PathId
NoteFree-text notes for the task.String (-1)
smmActivityUserMemo
NoYesProjPlanVersion.UserMemo
TaskName of the task.String (255)
ProjTaskName
NoYesProjPlanVersion.TaskName
PredecessorsThe tasks that come before this task in the work breakdown structure.String (255)NoYesvirtual
CategoryCategory ID assigned to the task.String (30)
ProjCategoryId
NoYesProjPlanVersion.TaskCategory
EffortEffort for the task, in hours.Real
Hours
NoYesProjPlanVersion.TaskEffort
StartDateDate on which the task starts.Date
SchedFromDate
YesYesProjPlanVersion.TaskStartDate
EndDateDate on which the task ends.Date
SchedToDate
YesYesProjPlanVersion.TaskFinishDate
DurationLength of the task, as a number of days.Real
DaysAsReal
NoYesProjPlanVersion.TaskDuration
NumberOfResourcesNumber of resources for the task.Real
NumberOfResources
NoYesProjPlanVersion.NumberOfResources
RoleUnique code of the role. It is the key of the table.String (20)
PSASchedRoleId
NoYesPSASchedRole.RoleId
ActivityStatusProgress status of the task, such as not started, in process, completed, waiting or deferred.Enum
smmActivityTaskTimeType
  • NotStarted 0
  • InProgress 1
  • Completed 2
  • Waiting 3
  • Deferred 4
NoYesProjPlanVersion.TaskStatus
IsTaskClosedYes or No flag showing whether the task is closed.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjPlanVersion.IsTaskClosed
IsTaskMandatoryYes or No flag showing whether the task is mandatory.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjPlanVersion.IsTaskMandatory
HierarchyTreeTableRefRecIdPoints to a record in the hierarchy tree table by its system record ID.Int64
RefRecId
NoNo (private)HierarchyTreeTable.RecIdProjPlanVersion.HierarchyTreeTableRefRecId
TaskSiblingNumberLine number that orders the task among tasks at the same level.Real
LineNum
NoYesProjPlanVersion.TaskSiblingNumber
ParentTaskIdTask ID of the parent task. The metadata gives no label, so this is inferred from the name.low confidenceInt64NoYesProjPlanVersion.ParentHierarchyTaskId
ResourceCategoryRole the task needs. Points to a resource category record by its system record ID.Int64
ResourceCategoryRecId
NoNo (private)ResourceCategoryView.RecIdProjPlanVersion.ResourceCategory
TaskPriorityPriority of the task: low, normal or high.Enum
smmActivityPriority
  • Low 1
  • Normal 0
  • High 2
NoYesProjPlanVersion.TaskPriority
ActivityTaskTimeTypeProgress status of the task, such as not started, in process, completed, waiting or deferred.Enum
smmActivityTaskTimeType
  • NotStarted 0
  • InProgress 1
  • Completed 2
  • Waiting 3
  • Deferred 4
NoYesProjPlanVersion.ActivityTaskTimeType
IsCategoryMandatoryYes or No flag that restricts the activity category.Enum
NoYes

Platform enum: values not in the metadata extract.

NoYesProjPlanVersion.IsCategoryMandatory
CalendarIdThe ID of the calendar used for the task.String
CalendarId
NoNo (private)virtual
MSPIDUnique identifier (GUID). The metadata gives no label or other detail.low confidenceGuidNoYesProjPlanVersion.MSPID
EndNodeTrue or false flag showing whether the task is an end node of the hierarchy.Enum
FalseTrue
  • False 0
  • True 1
NoYesProjPlanVersion.EndNode
HierarchyLevelLevel of the task in the hierarchy.Integer
ProjHierarchyLevel
NoYesProjPlanVersion.HierarchyLevel
CalendarStandardWorkDayHoursThe number of hours in a standard working day in the calendar.Real
Hours
NoNo (private)virtual
TaskEffortAtCompleteEffort in hours for the task at completion.Real
Hours
NoYesProjPlanVersion.TaskEffortAtComplete
TaskCostAtCompleteTotal cost amount for the task. The currency is not stated in the metadata.Real
ProjTotalCostAmount
NoYesProjPlanVersion.TaskCostAtComplete

Foreign keys (3)

Each field below points to the key of another table. Join on it in Power BI, or follow the link to an entity that exposes that table.

Need help with ProjProjectWBSDraftEntity in Power BI, Power Automate or a migration? Talk to Dr Dynamics.

Email sales@drdynamics.co.uk