ProjPlanVersion

Work breakdown structure

Holds the tasks of a work breakdown structure for a project. Each task is identified by a hierarchy ID and a task ID. It stores dates, duration, effort, staffing status, cost and revenue figures, and the task's place in the hierarchy.

Table name
ProjPlanVersion
Module
Project management and accounting
Table group
Group
Table type
Regular
Data per company
Yes
Configuration key
Project
Primary index
HierarchyIdTaskNumber
Replacement key
HierarchyIdTaskNumber
Key fields
HierarchyId, HierarchyTaskId
Model
Foundation

Fields (38)

Field and descriptionType / EDT / enumMandatoryReferencesIn public entities
HierarchyIdIdentifier of the hierarchy that the task belongs to.String
HierarchyIdBase
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjWBSTemplateTasksEntityand 1 more
HierarchyTaskIdIdentifier of the task within the hierarchy.Int64
ProjHierarchyTaskId
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjWBSTemplateTasksEntityand 1 more
ActivityTaskTimeTypeProgress status of the task, such as not started, in process, completed, waiting or deferred.Enum
smmActivityTaskTimeType (enum)
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjPlanVersionBiEntity
DataAreaIdThe company (legal entity) that the record belongs to. System field.String (4)
DataAreaId
NoProjPlanVersionBiEntity
EndNodeTrue or false flag showing whether the task is an end node of the hierarchy.Enum
FalseTrue (enum)
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjPlanVersionBiEntity
HierarchyLevelLevel of the task in the hierarchy.Integer
ProjHierarchyLevel
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjPlanVersionBiEntity
HierarchyTreeTableRefRecIdPoints to a record in the hierarchy tree table by its system record ID.Int64
RefRecId
NoHierarchyTreeTable.RecIdProjProjectWBSDraftEntityProjQuotationWbsEntityProjPlanVersionBiEntity
IsCategoryMandatoryYes or No flag that restricts the activity category.Enum
NoYes (enum)
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjWBSTemplateTasksEntityand 1 more
IsTaskClosedYes or No flag showing whether the task is closed.Enum
NoYes (enum)
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjPlanVersionBiEntity
IsTaskMandatoryYes or No flag showing whether the task is mandatory.Enum
NoYes (enum)
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjPlanVersionBiEntity
MSPIDUnique identifier (GUID). The metadata gives no label or other detail.low confidenceGuidNoProjProjectWBSDraftEntityProjPlanVersionBiEntity
NumberOfResourcesNumber of resources for the task.Real
NumberOfResources
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjWBSTemplateTasksEntityand 1 more
ParentHierarchyTaskIdTask ID of the parent task. The metadata gives no label, so this is inferred from the name.low confidenceInt64NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjWBSTemplateTasksEntityand 1 more
PartitionA system field for the data partition. In most environments every record has the same value. System field.Int64
Partition
NoNone
PathIdWork breakdown structure ID that gives the path of the task in the hierarchy.String (255)
ProjHierarchyPathId
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjWBSTemplateTasksEntityand 2 more
RecIdA unique number that the system gives to every record. Other tables often use it to point to this record. System field.Int64
RecId
NoProjPlanVersionBiEntity
RecVersionA system number that changes each time the record is updated. It is used to detect conflicting updates. System field.Integer
RecVersion
NoProjPlanVersionBiEntity
ResourceCategoryRole the task needs. Points to a resource category record by its system record ID.Int64
ResourceCategoryRecId
NoResourceCategoryView.RecIdProjProjectWBSDraftEntityProjQuotationWbsEntityProjWBSTemplateTasksEntityand 1 more
SysRowVersionA system row version number that is used for change tracking. System field.Int64
SysRowVersion
NoProjPlanVersionBiEntity
TableIdA system number that identifies the table. System field.Integer
TableId
NoNone
TaskAssignedHoursHours assigned to the task.Real
Hours
NoProjPlanVersionBiEntity
TaskCategoryCategory ID assigned to the task.String (30)
ProjCategoryId
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjWBSTemplateTasksEntityand 1 more
TaskCostAtCompleteTotal cost amount for the task. The currency is not stated in the metadata.Real
ProjTotalCostAmount
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjPlanVersionBiEntity
TaskDurationLength of the task, as a number of days.Real
DaysAsReal
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjPlanVersionBiEntity
TaskEffortEffort for the task, in hours.Real
Hours
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjWBSTemplateTasksEntityand 1 more
TaskEffortAtCompleteEffort in hours for the task at completion.Real
Hours
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjPlanVersionBiEntity
TaskEffortToCompleteEffort in hours still needed to finish the task.Real
Hours
NoProjPlanVersionBiEntity
TaskFinishDateDate on which the task ends.Date
SchedToDate
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjPlanVersionBiEntity
TaskNameName of the task.String (255)
ProjTaskName
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjWBSTemplateTasksEntityand 2 more
TaskPriorityPriority of the task: low, normal or high.Enum
smmActivityPriority (enum)
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjWBSTemplateTasksEntityand 1 more
TaskProjectedCostTotal projected cost price of the task, in accounting currency.Real
AmountMST
NoProjPlanVersionBiEntity
TaskProjectedEndDateDate on which the task is expected to end.Date
SchedToDate
NoProjPlanVersionBiEntity
TaskProjectedRevenueTotal projected sales price of the task, in accounting currency.Real
AmountMST
NoProjPlanVersionBiEntity
TaskSchedulingStatusStaffing state of the task: not staffed, partially staffed, fully staffed, or fully staffed with conflict.Enum
PSAScheduled (enum)
NoProjPlanVersionBiEntity
TaskSiblingNumberLine number that orders the task among tasks at the same level.Real
LineNum
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjWBSTemplateTasksEntityand 1 more
TaskStartDateDate on which the task starts.Date
SchedFromDate
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjPlanVersionBiEntity
TaskStatusProgress status of the task, such as not started, in process, completed, waiting or deferred.Enum
smmActivityTaskTimeType (enum)
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjWBSTemplateTasksEntityand 1 more
UserMemoFree-text notes for the task.String (-1)
smmActivityUserMemo
NoProjProjectWBSDraftEntityProjQuotationWbsEntityProjWBSTemplateTasksEntityand 1 more

Indexes (8)

Relations (3)

Each relation joins ProjPlanVersion to another table on the fields shown.

  • HierarchyTreeTable → HierarchyTreeTable

    Join on HierarchyTreeTableRefRecId = HierarchyTreeTable.RecId

    Zero or one ProjPlanVersion record → zero or one HierarchyTreeTable record

  • ResourceCategory → ResourceCategoryView

    Join on ResourceCategory = ResourceCategoryView.RecId

    Many ProjPlanVersion records → zero or one ResourceCategoryView record

  • ProjWBSTaskEstimateUnionView → ProjWBSTaskEstimateUnionView

    Join on TableId = ProjWBSTaskEstimateUnionView.SourceTableId, RecId = ProjWBSTaskEstimateUnionView.SourceRecId

    Exactly one ProjPlanVersion record → zero or one ProjWBSTaskEstimateUnionView record

Get this data out

Tables are not exposed directly. These public entities read from ProjPlanVersion; use one of them in Power BI, Power Platform or a data management project.